| Customization: | Available |
|---|---|
| After-sales Service: | on Line/on Site |
| Warranty: | 13months After B/L |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Production Name | Bohai Arch Roof Roll Forming Machine |
| Size | 8900mm X 2230mm X 2300mm (With Single Axle 4 Tires) |
| Total Weight | About 10 Ton |
| Thickness of Bending Leaf | 10mm thickness, processed by CNC |
| Cutting Blade | 12CrMov Material, Heat Treatment |
| Cutting Type | Mechanical Cutting |
| Forming Type | Roll-Formed and Length-Set Cutting |
| Power | Total Motor Power : 17.5KW Main Motor Power : 7.5KW Bending Power : 3.0KW+1.5KWx2 Cutting Power : 4.0KW |
| Seaming Power | 1.1KW+1.1KW |
| Roller Material | 45# High-Quality Steel, Quenched HRC 55~65, Hard Chrome Plating |
| Shaft Material | 45# High-Quality Steel, Galvanized |
| Stand of Molding | 13+1 Steps |
| Feeding Width | 914mm |
| Effective Width | 610mm |
| Using Rate | 66.7% |
| Thickness Coil | 0.5-1.6mm |
| Speed | Forming Part : 15m/min Bending Part: 13m/min Seaming Part: 16m/min |
| Suitable Span | 6~38m |
| De-Coiler | Inner-Diameter of Coil : 450mm ~ 650mm, Max Width of Coil : 914mm ~ 934mm Load : 10Ton |


| Step 1: Tell us your requirements. |
| Step 2: Quoataion will be sent based on your requirement. Solution will be recommended to you as the alternative. |
| Step 3: Negotiate and confrim each details for goods, trading terms and so on, get agreement and sign contract. |
| Step 4: Advanced payment and production. |
| Step 5: Factory examine goods/ rectify and reform to meet the requirements of contract. |
| Step 6: Balance payment and shipping. |
| Step 7: Handing shipping files to help clients get goods from transporter in time. |
| Step 8: Clients get goods and go into warranty time. |
| Step 9: Provide overseas service for clients. |