Customization: | Available |
---|---|
After-sales Service: | on Line/on Site |
Warranty: | 1years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Production Name | BH Decking Floor Tile Making Machine |
De-Coiler | Passive Open the Coil, Expansion |
Capability of De-Coiler | 5T |
Frame of Machine | Welded with 400H Beam Steel |
Form of Guide Feeding | Side Roller Type |
Machine Form | Wallboard Chain Transmission |
Wallboard Thickness | 20mm |
The Diameter of Main Shaft | Ø90mm |
Chain | 2 Inch |
Power of Main Motor | 11KW×2 |
Forming Speed | 12m/min |
Roller Station | 28 Steps |
Material of Roller | Superior 45# Steel Forging, Thermal Refining |
The Surface of Roller Coating Hard Chromium Quenching | 0.05mm |
Power of Hydraulic Motor | 5.5KW |
Hydraulic Station Pressure | 20Mpa |
Cutting Type | Hydraulic Cutting, Guide Column Cutting Head |
Material of Cutting Blade | Cr12, Heat Treatment ,HRC58°-60° |
Oil Pump of Hydraulic Station | Gear Pump |
Cutter | Hydroforming Shear |
The Material of Cutting Blade | Cr12Mov |
Material Thickness | 0.8 -1.2mm |
Feeding Width | 1220mm |
Effective Width | 900mm |
Controlling System | PLC Frequency Control |
PLC | Panasonic, Touch Screen, Delta Frequency Changer |
Encoder | Omron |
Dimension | 15500x1400x1300(mm) |
Model | Feeding Width | Effective Width | Thickness Coil |
BHD-130-300-600 | 1000mm | 600mm | 0.8-1.2mm |
BHD-75-200-600 | 1000mm | 600mm | 0.8-1.2mm |
BHD-56-180-720 | 1000mm | 720mm | 0.4-0.6mm |
BHD-105-250-750 | 1250mm | 750mm | 0.7-1.0mm |
BHD-65-300-900 | 1220mm | 900mm | 0.8-1.2mm |
BHD-35-200-1000 | 1250mm | 1000mm | 0.4-1.0mm |
BHD-31-200-1000 | 1220mm | 1000mm | 0.3-0.8mm |
Step 1: Tell us your requirements. |
Step 2: Quoataion will be sent based on your requirement. Solution will be recommended to you as the alternative. |
Step 3: Negotiate and confrim each details for goods, trading terms and so on, get agreement and sign contract. |
Step 4: Advanced payment and production. |
Step 5: Factory examine goods/ rectify and reform to meet the requirements of contract. |
Step 6: Balance payment and shipping. |
Step 7: Handing shipping files to help clients get goods from transporter in time. |
Step 8: Clients get goods and go into warranty time. |
Step 9: Provide overseas service for clients. |