Customization: | Available |
---|---|
Use: | Roof |
Total Motorpower: | 15kw |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Production Name | BoHai Z Purlin Roll Forming Machine |
Rolling Material | 2-3mm Thickness, Yielding Strength≤G250 Galvanized Steel Sheet |
Frame of Machine | Welded with 400H Beam Steel |
Forming Type | Wallboard Type, 2 Inch Chain Drive |
Forming Speed | 12m/min |
Step of Rollers | 20 Steps |
Wallboard Thickness | 20mm |
Material of Roller | 9CrSi |
Material of Main Shaft | 45# Steel, Thermal Refining |
Spindle Diameter | ¢90 mm |
Main Motor Power | 15 KW |
Hydraulic Station Motor Power | 7.5 KW |
Hydraulic Station Pressure | 12MPa |
Material of Cutting Blade | Cr12, Quenched. |
Cutting Type | Hydraulic Cutting, Cutting after Forming |
Cutting Type | No Limit Cutting |
Electric Control System | Whole Machine Adopts PLC |
Machine Size | 9000x1000x1200mm |
Model | a(mm) | b(mm) | c(mm) | t(mm) |
1 | 80 | 40 | 15 | 2-3 |
2 | 80 | 50 | 15 | 2-3 |
3 | 100 | 50 | 15 | 2-3 |
4 | 120 | 50 | 20 | 2-3 |
5 | 140 | 50 | 20 | 2-3 |
6 | 140 | 60 | 20 | 2-3 |
7 | 150 | 50 | 20 | 2-3 |
8 | 150 | 60 | 20 | 2-3 |
9 | 160 | 50 | 20 | 2-3 |
10 | 160 | 60 | 20 | 2-3 |
11 | 160 | 70 | 20 | 2-3 |
12 | 180 | 60 | 20 | 2-3 |
13 | 180 | 70 | 20 | 2-3 |
14 | 200 | 65 | 20 | 2-3 |
15 | 200 | 70 | 20 | 2-3 |
16 | 220 | 70 | 20 | 2-3 |
17 | 220 | 80 | 20 | 2-3 |
18 | 240 | 70 | 20 | 2-3 |
19 | 240 | 80 | 20 | 2-3 |
20 | 250 | 70 | 20 | 2-3 |
21 | 250 | 80 | 20 | 2-3 |
22 | 300 | 70 | 20 | 2-3 |
23 | 300 | 80 | 20 | 2-3 |
Model | h(mm) | b1(mm) | b2(mm) | c(mm) | t(mm) |
1 | 100 | 50 | 54 | 20 | 2-3 |
2 | 120 | 50 | 54 | 20 | 2-3 |
3 | 140 | 50 | 54 | 20 | 2-3 |
4 | 150 | 60 | 64 | 20 | 2-3 |
5 | 160 | 60 | 64 | 20 | 2-3 |
6 | 180 | 70 | 74 | 20 | 2-3 |
7 | 200 | 70 | 74 | 20 | 2-3 |
8 | 220 | 80 | 84 | 20 | 2-3 |
9 | 240 | 80 | 84 | 20 | 2-3 |
10 | 250 | 80 | 84 | 20 | 2-3 |
Step 1: Tell us your requirements. |
Step 2: Quoataion will be sent based on your requirement. Solution will be recommended to you as the alternative. |
Step 3: Negotiate and confrim each details for goods, trading terms and so on, get agreement and sign contract. |
Step 4: Advanced payment and production. |
Step 5: Factory examine goods/ rectify and reform to meet the requirements of contract. |
Step 6: Balance payment and shipping. |
Step 7: Handing shipping files to help clients get goods from transporter in time. |
Step 8: Clients get goods and go into warranty time. |
Step 9: Provide overseas service for clients. |