Customization: | Available |
---|---|
After-sales Service: | on Line / on Site |
Warranty: | 13 Months After B/L |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Standard Configuration:
Mainframe: | 1 set |
Spray gun: | 1set |
Heating and preserved pipe: | 15m |
Connecting pipe for spray gun: | 1.5m |
Max. Pipe length: | 90m(optional) |
Transfer pump: | 2 sets |
Power Source: | 380V 50/60Hz 3 Phases |
Air Source: | 0.5~0.8Mpa (70~120psi) ≥0.9m3 /min |
Output: | 4~8kg/min |
Heating device power for material: | 3000W X 2(or optional: 4500W X 2) |
Heating power for pipe heating: | 3500w |
Single component output pressure: | 5~10Mpa (700~1500psi) |
Q: Can you make the machine according to my design or photo type?
A: Yes, we have an experienced team for working out the most suitable design and production plan for the machine according to your demand or photo type that you are going to book with us.
Q: Are you a factory or trading company?
A: We are a factory located in YingKou city, LiaoNing Province, China. Our city is near Beijing. All clients from abroad and home are warmly welcome to visit our factory!
Q: How do you guarantee the quality of the products?
A: Every section of our production has strict manufacture process, than professional inspectors check every section of the production, next the production will work for testing quality, which must be 100% quality assurance. Unqualified resolute don't a better factory.
Q: What is your service?
A: We provide the technical support for whole life. Pre-sales service includes inquiry and design support and view our factory. After-sales service includes training how to instal the machine, training how to use the machine, and engineers available to service machinery overseas.
How to Cooperate with each other?
Step 1: Tell us your requirements. |
Step 2: Quoataion will be sent based on your requirement. Solution will be recommended to you as the alternative. |
Step 3: Negotiate and confrim each details for goods, trading terms and so on, get agreement and sign contract. |
Step 4: Advanced payment and production. |
Step 5: Factory examine goods/ rectify and reform to meet the requirements of contract. |
Step 6: Balance payment and shipping. |
Step 7: Handing shipping files to help clients get goods from transporter in time. |
Step 8: Clients get goods and go into warranty time. |
Step 9: Provide overseas service for clients. |